Location:Middle East
Status:Engineering Phase Completed
Role:EPCF Contractor (Engineering, Procurement, Construction, and Financing)
Contract Signing18 March 2025
Site Mobilization and Land Grading25 March 2025
Mounting Structure Installation1 April 2025
Solar Panel Installation
Testing and Commissioning
Commissioned

Steelbridge Export was assigned to develop a 50 MW solar PV power plant under a full EPCF framework. The scope included site selection analysis, feasibility study, detailed electrical and structural design, vendor engagement for Tier-1 PV modules and inverters, and project financing strategy. The system is designed to operate with bifacial 680W TOPCon modules and multi-MPPT string inverters with full SCADA integration. All deliverables were prepared in accordance with international standards (IEC, IEEE, FIDIC).